“The roof was old and rotten”
Hidden decay is a listed cause. We show where the rot was and whether anyone could see it.
Snow load, ponding rain or hidden rot. Payment turns on how your policy defines “collapse”, so we read that wording and document the cause.

One bay or a porch roof can qualify.
Snow weight is often a covered peril by itself, so a cracked rafter can still be claimed.
Hidden decay is a listed cause. We show where the rot was and whether anyone could see it.
Flat roofs get blamed on maintenance. We gather drain records and that day’s rainfall.
We claim the cracked framing under the snow-load peril instead.
| Evidence | What it proves | When |
|---|---|---|
| Photos of the failure in place | Which member failed first. | Before shoring |
| A piece of the failed framing | Whether the decay was hidden inside. | During removal |
| Snow or rainfall records | The load was weather, not wear. | First week |
| Shoring and tarp invoices | Costs of preventing further damage. | As you pay |
Plus the connections on either side.
Wider than the opening itself.
Hit by debris or by weather.
Often paid as a separate item.
Often missedCurrent snow-load framing rules.
Often missedWhile the building cannot be used.
Often missed
We negotiated the claim; our construction partner built the roof.
“Thank you for your help with my roof claim and roof construction!” Anastasiia Karvatska
Damage beside the roof went into the same claim.
“Thank you for great service!” Oleg Babin
Had our roof replaced with this company. Extremely happy with the outcome. Highly recommend! A++++
Thank you for your help with my roof claim! You delivered on the promise!
Very effective representing us. Results couldn’t be better.
50 Ill. Adm. Code 919.50. We are public adjusters, not attorneys.
Under many current forms, no. The snow-load peril can still cover the damaged framing. We check your wording.
Not by itself. Hidden decay is a listed cause on many forms; where the rot was decides it.
Make it safe first. Before removal, photograph the failure and keep a piece of the failed framing.